This week, we completed both the PDR report and presentation. We have both in state that we are all happy with. Using that we traveled down to a Raytheon Facility in Largo, Florida to present alongside the other team. There was a bit of a change in schedule since the Interstate highway was closed earlier that morning, but we still arrived close to the intended time. Once we arrived, we got prepared and gave the presentation in front of various Raytheon employees, including our liaison. The presentation went well, and we received a good amount of feedback for both the presentation, and things we should consider for the future.
Afterwards, we ate lunch that was generously provided to us by Raytheon, and watched the other Raytheon team’s presentation, which was great. Then finally we took an in-depth tour of the site with both our team and the other team going through parts of the hardware and process of engineering and construction. Unfortunately, no photos were allowed to be taken inside the site, so there are no photos of PDR, but we did take a picture outside with the Raytheon Logo.