Week 8 was very productive in both the computer and mechanical sides of the project. On the computer side, the team’s computer engineers completed an in depth trade study to backup their component selection suggestions for our liaison. In our… Read More
Month: October 2026
Volout Avis Blog Post 6 Week 7: Final Revision of the Preliminary Design Report
Week 7 was mainly focused on finalizing the Preliminary Design Report. After taking in our liaison’s feedback from the presentation, and the IPPD Director’s feedback on the first draft of the written report, the team reviewed the draft and finalized… Read More
Volout Avis Blog Post 5 Week 6: Preliminary Design Report and Presentation for Liaison
Week 6 was mainly dedicated polishing and presenting our Preliminary Design Review to our liaison. Overall, our liaison was impressed with our presentation giving us a lot of positive feedback. He was especially happy with the current concepts that we… Read More
Volout Avis Blog Post 4 Week 5: Preliminary Design Review (PDR) Preparation and Presentation
Week 5 was largely dedicated to developing the initial draft of the PDR, both as a written report and as a presentation for our peers and coaches. In preparation, the team worked on evaluating and scoring the different alula mechanism… Read More