Prototype Inspection Ready

This week was pivotal as we prepared for the Prototype Inspection event, where our focus was on succinctly presenting our deliverables while highlighting the journey from problem identification to solution implementation. We focused on addressing challenges such as nozzle occlusion and temperature regulation deficiencies inherent in the intraocular lens (IOL) manufacturing process. Our solution comprised iterative design enhancements, including an optimized coolant nozzle and chip removal assembly, aimed at enhancing operational efficiency.

This week we conducted new simulations, drilled holes into our heat jacket, grinded the newest nozzle for the heat jacket, and refining the newest nozzle for precision. As we approached the event, we remained open to feedback, recognizing it as a catalyst for future enhancements and continuous improvement in the realm of IOL manufacturing thermal management optimization.

Here is a poem to reflect our week:
In preparation for the Prototype Inspection Day,
We worked tirelessly, come what may.
Drilling holes in heat jackets with care,
Grinding nozzles to perfection, a task so rare.

Simulations ran, each prototype refined,
Aiming for excellence, with every design combined.
Our journey from problem to solution, we trace,
In poetic rhythm, our progress we embrace.

At the event, we stood proud and tall,
Presenting our work, answering the call.
Feedback welcomed, for future strides we yearn,
In the realm of thermal management, it’s our turn.

Image 1: Grinded Newest Nozzle for the Heat Jacket

Leave a Reply

Your email address will not be published. Required fields are marked *