Week 7 was mainly focused on finalizing the Preliminary Design Report. After taking in our liaison’s feedback from the presentation, and the IPPD Director’s feedback on the first draft of the written report, the team reviewed the draft and finalized the document. Most work involved correcting formatting, and expanding on the concept design section, introducing our methods for design comparison and which design was most promising.
Additionally, the concept generation process has been taking place and close to be finalized. As a team, we have been creating trade matrices for both the alula mechanism and the Parakeet. At the moment, we are leaning into a design that is easy to construct and lightweight, to reduce its impact on aerodynamic performance. Likewise, the parakeet trade matrices are a work in progress, and at the moment we are finalizing the component selection, which are going to be compared mainly on weight and computational performance. The following weeks will involve a heavy amount of concept design, as our prototyping inspection day is arriving, and the team wants to have a solidified concept by the PID date. Below it is possible to see the type of aircraft the product will be implemented on.