This week, the FLARE team met to develop and finalize our Bill of Materials (BOM), resulting in the ordering of most major components needed for our prototype. We met with our GE Aerospace liaisons to walk through the progress we have made, including the heat transfer models developed during the previous week, and discussed how these analyses inform our design choices. Additionally, we met with our coach, who assigned individual follow-up tasks related to the BOM, including further heat transfer calculations and load analyses to determine appropriate insulation and fastening methods.