blog post 23: Gearing Up!

This week solar safe is focusing on getting ready for the PID day next week. Aayan is working tirelessly on getting the model to be user friendly and the Philips are finishing the touches on their latest lightning calculations and code. Sarah is finishing up her soil testing that has led to some interesting discoveries and Sasha has been researching open-source resistivity data for the model. Tensions have been high leading up to the PID but we are doing our best to work out any kinks before inspection day!

Figure 1:Solar Safe Team meeting, featuring Shridar

Leave a Reply

Your email address will not be published. Required fields are marked *