Week 13: Busy Bees!

LineTech after the peer review SLDR.

This week started off strong with our System Level Design Review (SLDR). After wrapping up our draft document and presentation on Sunday and Monday, we presented on Tuesday and received valuable peer feedback, especially around the frame design of our device. Later in the week, some team members headed to the prototyping lab to cut into the aluminum stock we received from FPL, confirming that it is suitable for constructing our spool. 

On Thursday, we met with Justin, our liaison from FPL, over lunch at The Flying Biscuit Café. We shared the latest version of our SLDR and gained insightful feedback, including advice to strengthen our testing processes by accounting for higher temperature maximums and wind speeds. With Thanksgiving break ahead, next week will be a rest period before we return to continue refining our design. Wish us luck as we move forward! 

Leave a Reply

Your email address will not be published. Required fields are marked *