Gathering Our Requirements

Welcome to the week of 9/20 blog post for team Electric Eye! This week we’ve began to dig deeper into the requirements and defining our specifications for our hazard detection system. The team has had an opportunity to meet with our liaison engineer at FPL and one of our stakeholders that will get direct usage of our device. Having these discussions has helped the team grow our confidence and better prepare ourselves to create a design that will fit what FPL needs! The team is ramping up with research and designing as we prepare for our Preliminary Design Review!

Team Electric Eye Logo

This week, we are unveiling our logo! After some feedback and revisions on our original design, and the great work from our own Brian Nielsen, we are happy to be able to show off our logo!

Our logo, much like our team name, takes inspiration from the goal of our project. The system we are looking to build will provide another layer of safety for FPL’s on-site workers, which is the inspiration for the shield that our lightning bolt and eye sit on. Again, the team would like to thank Brian for the hard work he put in to designing our logo!

That’s all we have for you this week! The team is preparing themselves for a great upcoming week of work and for Career Fair, so we’ll have more to talk about on next week’s post. Thank you for reading this week’s blog post from Electric Eye!

Leave a Reply

Your email address will not be published. Required fields are marked *